Project Scope

WJFE was contacted to provide the demolition plans for the existing timber bridge deck with asphalt wearing surface as well as the steel truss superstructure and floor beams.  The truss sections were analyzed for adequate lifting points and temporary bracing and concrete deadman block were installed to facilitate the demolition. 

Location: Mount Vernon, NY    |    Client: Northeast Structural Steel  |    Owner: MTA Metro-North Railroad